Client
STANTEC
Location
San Diego, CA
Services Provided
Surveying
Lead Engineer
Andrew Karydes
San Vicente Indirect Potable Reuse Pipeline
SDE performed topographic surveys to deliver accurate utility data to the design team, using staked potholes to verify and confirm existing record information. In addition, SDE provided aerial topographic mapping for the 25-mile Pure Water Program. Task 7 covered approximately 12 miles from the Morena Boulevard Pump Station and Friars Road, north along Morena Boulevard to Clairemont Drive, Genesee Avenue, and the North City Water Reclamation Plant (NCWRP) at Interstate 805 North. Task 8 extended another 13 miles east from the NCWRP directly to Lake Miramar. Through these efforts, SDE supported the overall design process and ensured the accuracy of record and design data.